Here are the four new refined concepts for Sepulveda Transit Corridor

Three community meetings will be held to discuss the new refined concepts beginning Wednesday night. They are:

Wednesday, January 30, 6 – 8 p.m.
Westwood Presbyterian Church
Hoffman Hall
10822 Wilshire Blvd.
Los Angeles, CA 90024

Saturday, February 2, 10 a.m. – 12 p.m. 
Marvin Braude Constituent Service Center
6262 Van Nuys Blvd.
Van Nuys, CA 91401

Tuesday, February 5, 6 – 8 p.m. 
Proud Bird Restaurant
Aviator Room
11022 Aviation Blvd.
Los Angeles, CA 90045

A presentation will be given at 10:30 a.m. for the Saturday meeting and 6:30 p.m. for the evening meetings.

All Metro meetings are held in ADA accessible facilities. Spanish translation provided. Other ADA accommodations and translations are available by calling 323.486.3876 or California Relay Service at 711 at least 72 hours in advance. 

Refined-Concepts.jpg

Four refined concepts (above) have been released for the Metro project that will build a fast, high-capacity transit line between the San Fernando Valley and the Westside through the Sepulveda Pass. Three of the four are heavy rail — i.e. the type of trains used on Metro’s Red/Purple Line subway  — and the other concept is a monorail. 

The refined concepts are part of an ongoing Feasibility Study for the Sepulveda Transit Corridor project, which has nearly $10 billion in funding from Metro’s Measure R and M sales tax measures approved by L.A. County voters in 2008 and 2016, respectively. Here is a new presentation; many of the slides are included in this post. 

Before diving into the concepts, I think there are two slides worth mulling as both show the importance and benefits of the project. The first shows that this line is being designed to be fast — faster than driving the 405 over the Sepulveda Pass much of the time. 

Previous
Previous

Planning and Land Use Committee - Meeting Agenda Wed., Feb. 13, 2019 - 7:15 PM

Next
Next

WLA Sawtelle Asphalt Repairs - March 5th - Nominate a Location!